131美女视频黄的免费千百音|狠狠色伊人久久精品综合网|欧美理论中文在线观看|国产精品亚洲无码

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1945

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
独山县| 朝阳市| 江孜县| 综艺| 澄迈县| 海兴县| 福安市| 双鸭山市| 宁武县| 西吉县| 额尔古纳市| 南川市| 阿拉善右旗| 临澧县| 九龙城区| 昌宁县| 怀远县| 旅游| 蓬溪县| 弥渡县| 富平县| 双城市| 建宁县| 昭通市| 兰西县| 扶绥县| 鄯善县| 中阳县| 哈尔滨市| 扎兰屯市| 繁昌县| 周宁县| 盐城市| 正安县| 济宁市| 新平| 大丰市| 洱源县| 景洪市| 玛沁县| 本溪市|